Final Project: Love/Hate Bots

November 28, 2008

I’m feeling a bit stressed since the Crits are coming up very soon!! I feel like the robots aren’t cooperating with me and working the way I want them to. My first batch were a failure and this batch is making me stressed. I really need to work up better ways to transfer the work from the breadboard to the piece. I’ve been scared to use the Lilypad because I have no idea wha would happen if I messed up.

Conductive thread hasn’t been that good for the piece. I feel as if the voltage cannot support the lighting up of the LEDs compared to the wire. I guess I’m going to be sticking to the wire for most of the robots.

MY CRIT IS IN 6 DAYS!! I need more sleep to maybe get the robots working better. I think the lack of sleep is making me more human error and the fumes from the solder is just fun to deal with. I think I should have rented a filter fan.

documentation page: http://cynnielee87.wordpress.com/

Advertisement

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.